Empanellment of Rooftop Grid Connected SPV Power Plant started. The last date and time for submission of E-bids is extended upto 20.07.2017 at 4.30 PM and opening of bids will be on 21.07.2017 at 11.30 a.m. For more details, pl visit www.etender.punjabgovt.gov.in.
Beneficiaries of projects above 5 KW capacity are required to submit hard copies of all reports along with necessary certificates in PEDA Office in addition to online submission for release of subsidy


Who Can Install?

Who Can Install?

  • All consumers of electricity having electricity sanctioned load more than 1.25 Kw  who intend to generate their own electricity and contribute towards environmental protection can install Solar PV plants on Roof-Tops/ Walls/Open area of Individual households, Industries, commercial establishments, institutions, residential complexes, Schools, Colleges, Hospitals, sheds, cold stores, govt. and semi-govt. buildings, etc.
;