CHECKLIST OF DOCUMENT REQUIRED FOR RELEASE OF SUBSIDY FOR THE INSTALLATION OF SPV POWER PLANT.   (View / Download)
Beneficiaries of projects above 5 KW capacity are required to submit hard copies of all reports along with necessary certificates in PEDA Office in addition to online submission for release of subsidy



Cost / Subsidy

Cost / Subsidy

L- I rates approved for setting up of Rooftop solar power plant in different categories are as under:

Sr. No.

Category

 Rates Approved (Rs. per KW)

System Cost

 AMC

Total Cost

1

1 to 5 kW

57420

​1370

58790

​2

5 to 10 kW

55340

​1370

​56710

3

10 to 20 kW

​47380

1370

48750

​4

20 to 50 kW

​49700

​1370

​51070

​5

50 to 100 kW

​46120

1370

​47490

6

100 to 500 kW

45000

3000

48000

B)  With Poly Crystalline Modules

Sr. No.

Capacity of SPV Power Plant (KW)

 Rates Approved (Rs. per KW)

System Cost

 5 year AMC

Total Project Cost

1

1 to 4

68000

​7000

​75000

​2

5 to 10

68000

​7000

​75000

3

11 to 20

​63590

​6300

69890

​4

21 to 30

​62130

​6200

68330

​5

31 to 50

​59800

6000

65800

6

51 to 75

58650

5800

64450

7

76 to 100

58650

5800

64450

8

101 to 250

54630

5500

60130

9

251 to 500

54450

5500

59950

The MNRE, GOI applicable CFA will be released on the bench mark price or on L-1 rates or actual expenditure incurred,whichever is lower.

;